A builders' lien or construction lien is a legal claim made by contractors, subcontractors, or suppliers against a property they have worked on or supplied materials to. It serves as a security interest in the property to ensure payment for work performed or materials provided.
The main purpose of a builders' lien is to provide protection for those involved in the construction process by ensuring they receive payment for their contributions. It acts as a form of collateral against the property until the debt is settled.
To file a lien, the claimant must typically register their interest with the appropriate authority. In the UK, this process involves submitting a claim to the High Court or the County Court. The lien must be filed within a specific time frame from when the work was completed or the materials were supplied, usually within 6 months. Once filed, it encumbers the property, meaning the property cannot be sold or refinanced without first addressing the lien. This provides leverage to the claimant to ensure they are paid.
Liens generally have a priority order, meaning some liens may take precedence over others. In the UK, the order of priority is typically determined by the date the lien was filed.
To resolve a builders' lien, the property owner must pay the debt owed to the claimant. This can be through direct payment or through other arrangements such as settlement negotiations. Once the debt is settled, the lien is removed from the property. If the debt is not paid, the claimant may enforce the lien through legal action, which can result in the sale of the property to satisfy the debt.
Proper notice must be given to the property owner before filing a lien. This typically involves a written notice outlining the claim and the amount owed. Strict time limits apply to filing and enforcing a builders' lien. Missing these deadlines can result in losing the right to claim the lien. Detailed and accurate records of the work performed and materials supplied are essential to support a lien claim. This includes contracts, invoices, and correspondence related to the project.
A builders' lien provides a critical tool for those in the construction industry to secure payment and protect their financial interests. However, it also imposes significant obligations and risks for property owners, who must be aware of their rights and responsibilities in managing and contesting lien claims.
[edit] Related articles on Designing Buildings
Featured articles and news
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.